Lottery Project

Gents Heads Completed!

picture

Looking forward by the two WC cubicles. Note, the tiles on the deck where it was once bare steel.

 

 

 

 

Looking aft to the entrance door. Hot air hand drier on the bulkhead. These have been installed in all toilet spaces and replace towels as a more hygienic option.

Posted by Lewis Folland, Tue 5 May 2015